|
Oxygen Filling Connection
When the
sample and fusewire are in the bomb and the lid is fastened hand tight, the
bomb must be filled with oxygen. The flexible tube attached to the oxygen
cylinder is connected to the oxygen connection on the bomb lid. The knurled
union nut should be tightened finger tight and the pressure release valve at
the oxygen cylinder should be shut.
Once these connections are made,
crack open the valve on the oxygen cylinder about one quarter turn and
adjust the pressure in the connecting hose to fill the bomb slowly. Pressures
up to 20 atmospheres of oxygen may be placed in the bomb. After the bomb is
filled, turn off the oxygen supply and release the pressure in the connecting
hose by opening the pressure release valve at the cylinder connection. The
filling connection has a check valve that will maintain pressure in the bomb.
Disconnect the hose. |
|